Figure 7: Collect Requirements: Inputs, Tools and Techniques, and Outputs. Reprinted from "A Guide to the Project Management Body of Knowledge (PMBOK Guide), (5th Edition)" by Project Management Institute, 2013, p. 111. Newton Square, PA: Project Management Institute, Inc. Reprinted without permission

Figure 7: Collect Requirements above depicts all the possible inputs tools and techniques resulting in Requirements documentation and Requirements trace-ability matrix.

5.2 Collect Requirements Process Definition

Collect Requirements are the basis of documenting and deciding which requirements meet project objectives. Acting upon these requirements through further refinement provides the means of defining the project and product scope.

 Process Assessment 

Project success hinges on active participation and it input from stakeholders in discovery to arrive at defined requirements necessary to meet or exceed the stakeholder’s expectations. Requirements collection documents capabilities and features necessary to make the scope and product scope a viable usable product. Each requirement is decomposed into a work breakdown structure. The work breakdown structure is utilized to create a measurable baseline of scope and it makes it easier to plan, direct and control project processes. Stakeholder involvement continues throughout the life cycle to ensure that the stakeholder’s expectations are met as defined. 

Collect Requirements

5.2.1

Input

Stakeholder Register 502:

In PGMT 502, developed a stakeholder register to identify key stakeholders' influence upon requirements or inputs concerning requirements using stakeholder analysis.

5.2.2

Tools and Techniques

Prioritization Decision Tool 611: 

PGMT 611, our group completed an exercise in determining what criteria was important in obtaining the correct mix of films base upon market analysis of our target market by assigning a weight to each objective. This is a tool and a technique, which is utilized to prioritize project requirements by importance

5.2.3

Output

Requirements Project Management Plan 501:

In this project for Rock and Roll Design created in PGMT 501, the city set the criteria of the requirements with a set price. The bid put out to Request for Bid to include all the requirements listed for a fixed price of $168,000 and this project management plan is an output of the collect requirement.